This animation shows the extent of shading provided from 10 am to 2 pm in mid March and September.  The air conditioning load for these laboratiories was greatly reduced by this sunshade design.

 

 

 

 

  

 

 

 

 

UCSB Life Sciences Building

Exterior Wall Studies