These images are from a web cam installed on top of the Marriott hotel nearby.  The movie shows 20 months of work, beginning approximately one year after the August 1998 ground breaking.  The first year was spent building the slurry wall foundation shown in the first image.  These frames show the entire period of steel construction, and the fireproofing and curtain wall can be seen climbing the building after the steel topped out in August 2000.

 

 

 

 

 

 

 

 

 

 

 

 

This file is 11MB - it may take several minutes on slower connections.

 

Four Seasons Hotel and Residences

San Francisco